Zubair Oil Field Development
Iraq, Zubair
Commercial
Drake & Scull Oil & Gas
ENI Iraq BV
Nil
• Total Manhours spent: 5,840,242
• Conrete: 12,000 m3
• Road Crossings: 1257 thrust boring
• and open cut.
• Earth moving & Backfilling: 755,000 m3
• 2300 tonnes of Piping.
• 250 tonnes of pipe supports.
• 120 tonnes of platforms
• MV Cable: 582 KM
• LV Cable: 91 KM
• FOC Cables: 521KM